Summary for Test 2025-09-25-113-5

Test performed: CTM 521-June 2020

Project Information

Project IdentifiersProject ID: 1000777
DEA: 07370404
EFIS: 0720000128
DIST-CO-RTE-PM07-LA-5-R59.5/R73.7
Award Date02/06/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS.
Location DescriptionLOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING.
QA Service Level1 (Verified on 11/25/2024)

Sample Information

Sample Taken Date09/25/2025 Sample Unique Key113
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/26/2025
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byBrenda Last name of sampler or witnessed byAmaya
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification Linked DIME Sample IDS63C451T1 Set 1
The fabricator/manufacturer/facility nameNational Ready Mix Santa Clarita Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameN/B Barrier Wall Transition at RTE 5 S/B Underpass Left shldr Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS63C451T1
The truck number from where the sample was collected1 The batch plant ticket number from where the sample was collected0
Concrete batch plantNational Ready Mix The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedN/B Barrier Wall Transition at RTE 5 S/B Underpass Left shldr Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Test Details

DIME Sample ID: 2025-09-25-113
DIME Test ID: 2025-09-25-113-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2026-01-07

Test Results


Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Calculated
Tester's full name: David Silva
Date of test: 10/23/2025
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 4.00 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 49100 lb
Maximum load on cylinder 2: 46200 lb
Maximum load on cylinder 3: 45230 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Type of fracture pattern of cylinder 3: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.57 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength (to nearest 10 psi): 3730 psi
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/7/2026