Summary for Test 2025-12-10-42-2

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 1000777
DEA: 07370404
EFIS: 0720000128
DIST-CO-RTE-PM07-LA-5-R59.5/R73.7
Award Date02/06/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS.
Location DescriptionLOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING.
QA Service Level1 (Verified on 11/25/2024)

Sample Information

Sample Taken Date12/10/2025 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/11/2025
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byBrenda Last name of sampler or witnessed byAmaya
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification Linked DIME Sample IDS63C451T1 Set 1
The fabricator/manufacturer/facility nameNational Ready Mix Santa Clarita Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameS/D Barrier Leftside S/B S.O Templin Hwy Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS63C451T1
The truck number from where the sample was collected1 The batch plant ticket number from where the sample was collected0
Concrete batch plantNational Ready Mix The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedS/D Barrier Leftside S/B S.O Templin Hwy Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Test Details

DIME Sample ID: 2025-12-10-42
DIME Test ID: 2025-12-10-42-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-01-07

Test Results


Input Type: Calculated
Tester's full name: Brenda Amaya
Date of test: 12/10/2025
Air Content: 3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/7/2026