Summary for Test 2025-12-15-35-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000888 DEA: 07346304 EFIS: 0718000073 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-7.9/11.8 |
| Award Date | 04/28/2025 |
| Closeout Date | Not set |
| Work Description | INSTALL RUBBERIZED HOT MIXED ASPHALT. |
| Location Description | LOS ANGELES COUNTY IN THE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE SOUTH OF PILGRIMAGE OVERCROSSING TO ROUTE 101/170 SEPARATION. |
| QA Service Level | 1 (Verified on 07/16/2025) |
Sample Information
| Sample Taken Date | 12/15/2025 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/15/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 3 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Dillon |
| Title of sampler | Field Technician | Telephone number of sampler | 909-657-1716 |
| Laboratory sample identification | 25-3929 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Existing Subgrade | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-12-15-35
DIME Test ID: 2025-12-15-35-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-01-07
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Mike Dillon
Date of test: 12/15/2025
Sum of Count or Density: 223854 g/cc
Average of Count or Density: 74618 g/cc
Sum of Moisture Count: 8325 g/cc
Average of Moisture Count: 2775 g/cc
Count Ratio Density: 1.86
Count Ratio Moisture: 0.23
Calculated Percent Relative Compaction: 85.7 %
Reported Percent Relative Compaction: 86 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/7/2026 ✔
