Summary for Test 2025-12-17-35-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 993595
DEA: 042Q5504
EFIS: 0419000024
DIST-CO-RTE-PM04-SOL-12-7.9/14.1
Award Date02/14/2025
Closeout DateNot set
Work DescriptionRHMA OVERLAY, REPLACE CULVERTS, BRIDGE RAILS, AND MEDIAN BARRIERS.
Location DescriptionSOLANO COUNTY NEAR SUISUN CITY FROM 0.2 MILE EAST OF LAWLER RANCH PARKWAY TO 0.5 MILE EAST OF SHILOH ROAD
QA Service Level1 (Verified on 02/22/2022)

Sample Information

Sample Taken Date12/17/2025 Sample Unique Key35
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/18/2025
Sample typeQuality Assurance A brief description of the sample3/4" hma-wma
The quantity of what the sample constitutesPSUE From where was the sample collectedManufacturer
First name of sampler or witnessed byCody Last name of sampler or witnessed byC
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert Woodland Batch Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Teichert Woodland
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBatch Plant Hot Bins
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number2
Sublot number11 Aggregate Mix Number

Test Details

DIME Sample ID: 2025-12-17-35
DIME Test ID: 2025-12-17-35-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2026-01-06

Test Results


How many times will the test be run?: 3 Times
Input Type: Calculated
Tester's full name: FH
Date of test: 12/19/2025
Sand Equivalent (Test 1): 71
Sand Equivalent (Test 2): 72
Sand Equivalent (Test 3): 83
Sand Equivalent: 72
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/6/2026