Summary for Test 2025-12-03-69-2

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 1000510
DEA: 060W79U4
EFIS: 0622000189
DIST-CO-RTE-PM06-KER,TUL-99-56.4/57.6,0.0/13.5
Award Date04/10/2025
Closeout DateNot set
Work DescriptionRDWY EXC, HMA, AGGREGATE BASE, CRCP, SIGN STR, AND STR EXC.
Location DescriptionKERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING
QA Service Level1 (Verified on 08/26/2024)

Sample Information

Sample Taken Date12/03/2025 Sample Unique Key69
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/04/2025
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes9 From where was the sample collectedJob Site
First name of sampler or witnessed byTyler Last name of sampler or witnessed byGraber
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification163457 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalPortland Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSTA 466+75 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number163457
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantCalPortland The fabricator/manufacturer designation for the sample163457
A detailed description of where the material sample was collectedSTA 466+75 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-12-03-69
DIME Test ID: 2025-12-03-69-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-12-31

Test Results


Input Type: Calculated
Tester's full name: Tyler Graber
Date of test: 12/03/2025
Air Content: 1.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/31/2025