Summary for Test 2025-09-25-107-7
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 994369 DEA: 042K6404 EFIS: 0416000480 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-84-6.0 |
| Award Date | 07/14/2023 |
| Closeout Date | 02/26/2025 |
| Work Description | CONSTRUCT SOLDIER PILE WALL. |
| Location Description | SAN MATEO COUNTY NEAR LA HONDA 0.2 MILE WEST OF SAN GREGORIO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 04/05/2023) |
Sample Information
| Sample Taken Date | 09/25/2025 | Sample Unique Key | 107 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4"RHMA-SP |
| The quantity of what the sample constitutes | 100Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Christian | Last name of sampler or witnessed by | Sousa |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Teichert Woodland | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 3 |
| Sublot number | 2 | HMA Mix Number | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-09-25-107
DIME Test ID: 2025-09-25-107-7
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2025-12-17
Test Results
Number of tests: 2
Is the sample lab compacted or field compacted?: Field compacted
Input Type: Calculated
Tester's full name: ASM Faruque Hossain
Date of test: 09/25/2025
| 1 | 2 | |
|---|---|---|
9.9 % | 11.1 % | |
10.5 % | ||
89.5 % |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/17/2025 ✔
