Summary for Test 2025-10-09-77-7

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 1000176
DEA: 034H76U4
EFIS: 0323000040
DIST-CO-RTE-PM03-BUT-32-5.0/10.2
Award Date06/17/2024
Closeout DateNot set
Work DescriptionREHABILITATE PAVEMENT, INSTALL SIGNAL, LIGHTING, DRAINAGE, & ADA RAMPS
Location DescriptionBUTTE COUNTY IN CHICO FROM MUIR AVENUE TO INTERCHANGE OF STATE ROUTES 99 AND 32
QA Service Level1 (Verified on 04/18/2024)

Sample Information

Sample Taken Date10/09/2025 Sample Unique Key77
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/04/2025
Sample typeQuality Assurance A brief description of the sample64-16
The quantity of what the sample constitutes1 can of binder From where was the sample collectedSource
First name of sampler or witnessed byMark Last name of sampler or witnessed byAtteberry
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namekrg orland Transportation Laboratory (TL) Number955756
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierPacific Northwest Oil - Stockton CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2025-10-09-77
DIME Test ID: 2025-10-09-77-7
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-12-17

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 12/17/2025
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 204.735 grams
Mass of container #2 before test (m2i): 209.442 grams
Mass of container #1 after test (m1f): 204.683 grams
Mass of container #2 after test (m2f): 209.394 grams
Mass of empty container #1: 169.491 grams
Mass of empty container #2: 174.316 grams
Mass correction factor: 0.030
Average mass change: -0.112 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE

Test was verified on 12/17/2025