Summary for Test 2025-12-09-31-7

Test performed: AASHTO T308-25

Project Information

Project IdentifiersProject ID: 1001056
DEA: 112N2074
EFIS: 1123000286
DIST-CO-RTE-PM11-SD-54,805-Var
Award Date05/23/2025
Closeout DateNot set
Work DescriptionGRIND BRIDGE DECKS, POLYESTER CONCRETE OVERLAY, REPAIR APPROACH SLABS.
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 05/30/2025)

Sample Information

Sample Taken Date12/09/2025 Sample Unique Key31
Date that the sample was received by the laboratory/organization performing the testing12/10/2025 Sample typeProduction Start-Up
A brief description of the samplePSU The quantity of what the sample constitutes12 boxes
From where was the sample collectedSource First name of sampler or witnessed byMohammed
Last name of sampler or witnessed byMasud Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Otay
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix Number320200 Otay Val
Binder content (%)4.9 Virgin binder PG PG58-16
Design binder PG PG 64-16 Binder SupplierValero
RAP content (%)22 WMA AdditivesNo
Antistrip typeNone

Test Details

DIME Sample ID: 2025-12-09-31
DIME Test ID: 2025-12-09-31-7
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-12-17

Test Results


What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Mohammad Abbassi
Date of test: 12/19/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4015.1 g
Mass of the specimen and specimen basket assembly prior to ignition: 5665.7 g
Mass of HMA Sample prior to ignition: 1650.6 g
Mass Loss: 111.6 g
Mass of aggregate remaining after ignition: 1539.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.76 %
General comments (publicly viewable) (Max 1000 characters): 3 RAP burns

Test was verified on 12/17/2025 ✔