Summary for Test 2025-11-05-20-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994574
DEA: 050C7334
EFIS: 0518000116
DIST-CO-RTE-PM05-SCR-1-10.5/13.4
Award Date06/29/2023
Closeout DateNot set
Work DescriptionCONSTRUCT OVERCROSSING AND AUXILIARY LANE/ Replace Capitola Ave OC + RWs and SWs
Location DescriptionSANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM STATE PARK DRIVE OVERCROSSING TO 0.2 MILE NORTH OF BAY AVENUE UNDERCROSSING
QA Service Level1 (Verified on 04/13/2023)

Sample Information

Sample Taken Date11/05/2025 Sample Unique Key20
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing11/05/2025
Sample typeAcceptance A brief description of the sampleSkid Test Request
The quantity of what the sample constitutesMULTIPLE LANES From where was the sample collectedJob Site
First name of sampler or witnessed byDaniel Last name of sampler or witnessed byDait
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Salinas Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier36-0127
Structure nameCapitola OC Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeOther
Type of Traffic Control ProvidedN/A DIST-CO-RTE05-SCr-001
Direction of Travel Post Mile
Lanes to be TestedLane #1,Lane #2 Station12.93

Test Details

DIME Sample ID: 2025-11-05-20
DIME Test ID: 2025-11-05-20-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-12-12

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 12/09/2025
Air Temperature: 42
Tire Pressure: 25
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Bridge Curb
Reference Distance 1: 19
Reference Distance 2: 22
Reference Distance 3: 25
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 11
Position for Stationing 2: 11
Position for Stationing 3: 11
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.36
Corrected Coefficients of Friction for Stationing 2: 0.36
Corrected Coefficients of Friction for Stationing 3: 0.37
Average Coefficient of Friction: 0.36
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/12/2025