Summary for Test 2025-08-07-88-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1001033 DEA: 070Y1404 EFIS: 0724000135 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-60-R23.0,R24.8 |
| Award Date | 04/29/2025 |
| Closeout Date | 12/02/2025 |
| Work Description | MAINLINE SLABS, RAMPS, GORES, AUX LANES, SHOULDERS & DIGOUTS, SLURRY. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR FROM BREA CANYON ROAD UNDERCROSSING TO 0.4 MILE EAST OF GRAND AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 07/29/2025) |
Sample Information
| Sample Taken Date | 08/07/2025 | Sample Unique Key | 88 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/08/2025 |
| Sample type | Acceptance | A brief description of the sample | 3/4 HMA-A |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | VICTOR | Last name of sampler or witnessed by | Pham |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 25-776 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RJ Noble Orange | Transportation Laboratory (TL) Number | 0807A2 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 36R2508SPWEO | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-08-07-88
DIME Test ID: 2025-08-07-88-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-12-10
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Robert Achuela
Date of test: 09/02/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3937.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 6001.5 g
Mass of HMA Sample prior to ignition: 2063.8 g
Mass Loss: 102.9 g
Mass of aggregate remaining after ignition: 1960.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.29 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.70 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/10/2025 ✔
