Summary for Test 2025-11-18-60-2
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 1000777 DEA: 07370404 EFIS: 0720000128 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-R59.5/R73.7 |
| Award Date | 02/06/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS. |
| Location Description | LOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING. |
| QA Service Level | 1 (Verified on 11/25/2024) |
Sample Information
| Sample Taken Date | 11/18/2025 | Sample Unique Key | 60 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/19/2025 |
| Sample type | Acceptance | A brief description of the sample | 4X8 PCC cylinders |
| The quantity of what the sample constitutes | 130 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Arian | Last name of sampler or witnessed by | Angha |
| Title of sampler | Assistant Structure Representative | Telephone number of sampler | |
| Laboratory sample identification | 25-1179 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | National Ready Mix Concrete Company | Transportation Laboratory (TL) Number | 25111901 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S63C451T1 |
|---|---|---|---|
| The truck number from where the sample was collected | LOAD 1 | The batch plant ticket number from where the sample was collected | 314115 |
| Concrete batch plant | National Ready Mix Concrete Company | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | truck chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-11-18-60
DIME Test ID: 2025-11-18-60-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2025-12-08
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: James Lee
Date of test: 12/02/2025
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 3.99 in
Average diameter of cylinder 2: 3.99 in
Average diameter of cylinder 3: 3.99 in
Maximum load on cylinder 1: 53276 lb
Maximum load on cylinder 2: 53664 lb
Maximum load on cylinder 3: 45090 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 14 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.5 in^2
Cross sectional area of cylinder 2: 12.5 in^2
Cross sectional area of cylinder 3: 12.5 in^2
Compressive strength of cylinder 1: 4262.1 psi
Compressive strength of cylinder 2: 4293.1 psi
Compressive strength of cylinder 3: 3607.2 psi
Compressive strength (to nearest 10 psi): 4050 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/8/2025 ✔
