Summary for Test 2025-11-04-20-2
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 1000510 DEA: 060W79U4 EFIS: 0622000189 |
|---|---|
| DIST-CO-RTE-PM | 06-KER,TUL-99-56.4/57.6,0.0/13.5 |
| Award Date | 04/10/2025 |
| Closeout Date | Not set |
| Work Description | RDWY EXC, HMA, AGGREGATE BASE, CRCP, SIGN STR, AND STR EXC. |
| Location Description | KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING |
| QA Service Level | 1 (Verified on 08/26/2024) |
Sample Information
| Sample Taken Date | 11/04/2025 | Sample Unique Key | 20 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/05/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Soundwall 3 pile cap |
| The quantity of what the sample constitutes | 76 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Bandy Ahmed | Last name of sampler or witnessed by | Bandy Ahmed |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Calportland Tulare | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 163457 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 264174 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | SW3 near station 444+45 to 449+10.13 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-11-04-20
DIME Test ID: 2025-11-04-20-2
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2025-12-08
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Gurjeet Litt
Date of test: 12/02/2025
Capped in accordance with?: ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1: 4.00 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 50890 lb
Maximum load on cylinder 2: 48890 lb
Maximum load on cylinder 3: 49930 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.57 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength of cylinder 1: 4048.5 psi
Compressive strength of cylinder 2: 3889.4 psi
Compressive strength of cylinder 3: 3972.2 psi
Compressive strength (to nearest 10 psi): 3970 psi
General comments (publicly viewable) (Max 1000 characters): Required strenght 3600 psi @ 28 days
Test was verified on 12/8/2025 ✔
