Summary for Test 2025-12-04-26-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
| Award Date | 04/12/2023 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 12/04/2025 | Sample Unique Key | 26 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/04/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 147.3 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jareerattana | Last name of sampler or witnessed by | Sirisujarittham |
| Title of sampler | Field Technician | Telephone number of sampler | 562-564-9465 |
| Laboratory sample identification | 25-3820 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Existing Subgrade | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-12-04-26
DIME Test ID: 2025-12-04-26-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-12-05
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Jareerattana Sirisujarittham
Date of test: 12/04/2025
Sum of Count or Density: 7952 g/cc
Average of Count or Density: 2651 g/cc
Sum of Moisture Count: 304 g/cc
Average of Moisture Count: 101 g/cc
Count Ratio Density: 1.7
Count Ratio Moisture: 0.11
Calculated Percent Relative Compaction: 79.8 %
Reported Percent Relative Compaction: 80 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/5/2025 ✔
