Summary for Test 2025-11-06-82-5
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1000320 DEA: 11430324 EFIS: 1118000102 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-14.6/23.7 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MODIFY ELECTRICAL, CONCRETE PAVEMENT, DRAINAGE AND SIGNS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION |
| QA Service Level | 1 (Verified on 09/09/2024) |
Sample Information
| Sample Taken Date | 11/06/2025 | Sample Unique Key | 82 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/07/2025 | Sample type | Per Request |
| A brief description of the sample | Plant Sample | The quantity of what the sample constitutes | 3 bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Cordero | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertsons Miramar | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Not Provided |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | RRM 20036 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-11-06-82
DIME Test ID: 2025-11-06-82-5
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-12-11
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: Shawn Rivers
Date of test: 12/04/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.3
Sand reading (test 1): 3.9
Clay reading (test 2): 4.4
Sand reading (test 2): 4
Clay reading (test 3): 4.6
Sand reading (test 3): 4
Sand equivalent (test 1): 91
Sand equivalent (test 2): 91
Sand equivalent (test 3): 87
Sand equivalent before temperature correction: 90
Sand equivalent after temperature correction: 90
General comments (publicly viewable) (Max 1000 characters): Complies
Test was verified on 12/11/2025 ✔
