Summary for Test 2025-09-09-100-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 1000538
DEA: 042Q6104
EFIS: 0419000030
DIST-CO-RTE-PM04-NAP-29-R7.3/13.5
Award Date11/04/2024
Closeout DateNot set
Work DescriptionCOLD PLANE, RHMA OVERLAY, INSTALL MGS, CURB RAMP, AND RUMBLE STRIP.
Location DescriptionNAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF NAPA RIVER BRIDGE OVERHEAD TO 0.1 MILE SOUTH OF SIERRA AVENUE.
QA Service Level1 (Verified on 08/29/2024)

Sample Information

Sample Taken Date09/09/2025 Sample Unique Key100
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/09/2025
Sample typeQuality Assurance A brief description of the sample1/2" RHMA-G-WMA
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed byJP Last name of sampler or witnessed byMaypa
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Vallejo Drum Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-48-0002
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyer Belt-HMA Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number2
Sublot number17 Aggregate Mix Number

Test Details

DIME Sample ID: 2025-09-09-100
DIME Test ID: 2025-09-09-100-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2025-12-02

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: FH
Date of test: 09/11/2025
Sand Equivalent: 67
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/2/2025