Summary for Test 2023-05-02-87-4

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 214469
DEA: 030H08U4
EFIS: 0319000029
DIST-CO-RTE-PM03-SAC-50-L0.2/R6.1
Award Date06/30/2020
Closeout DateNot set
Work DescriptionSac 50 Design Build PLEASE NOTE THAT DESIGN BUILDER MUST PERFORM QUALITY VALIDATION TESTING IN ACCORDANCE WITH THE MATERIAL CONTROL SCHEDULE (MCS) FOR ITEMS SUCH AS STRANDS, HS BOLTS, ELASTOMERIC BEARING PADS, JOINT SEALANTS, COUPLERS & WELDED HOOPS, ETC
Location DescriptionFROM 0.1 MILE EAST OF I-5 TO 0.8 MILE EAST OF WATT AVE
QA Service Level1 (Verified on 10/23/2019)

Sample Information

Sample Taken Date05/02/2023 Sample Unique Key87
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing03/17/2023
Sample typeQuality Assurance A brief description of the samplestructural concrete
The quantity of what the sample constitutes1000 CY From where was the sample collectedJob Site
First name of sampler or witnessed byWilliam Last name of sampler or witnessed byBaker
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCemex Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number1615776
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected30720844
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-05-02-87
DIME Test ID: 2023-05-02-87-4
Testing Lab: CT D03 - Rocklin Construction Field Office
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2025-12-02

Test Results


Input Type: Calculated
Tester's full name: WILLIAM BAKER
Date of test: 05/03/2023
Temperature of the freshly mixed concrete: 67 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/2/2025