Summary for Test 2025-11-03-73-4
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000563 DEA: 021H7104 EFIS: 0217000013 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-3,5-L47.4,R45.5/R46.0 |
| Award Date | 11/13/2024 |
| Closeout Date | Not set |
| Work Description | NEW MECHANIC SHOP AT YREKA MAINTENANCE STATION. |
| Location Description | SISKIYOU COUNTY IN YREKA ON ROUTE 3 AT YREKA MAINTENANCE STATION AND ON ROUTE 5 FROM 0.2 MILE SOUTH TO 0.4 MILE NORTH OF SOUTH YREKA UNDERCROSSING #02-0159 |
| QA Service Level | 1 (Verified on 09/24/2024) |
Sample Information
| Sample Taken Date | 11/03/2025 | Sample Unique Key | 73 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/12/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 58-34m |
| The quantity of what the sample constitutes | 1 can of binder | From where was the sample collected | Source |
| First name of sampler or witnessed by | g | Last name of sampler or witnessed by | g |
| Title of sampler | tester | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Valero | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 877607 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-11-03-73
DIME Test ID: 2025-11-03-73-4
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-12-02
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 11/25/2025
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 206.212 grams
Mass of container #2 before test (m2i): 205.463 grams
Mass of container #1 after test (m1f): 206.113 grams
Mass of container #2 after test (m2f): 205.343 grams
Mass of empty container #1: 171.449 grams
Mass of empty container #2: 170.506 grams
Mass correction factor: 0.030
Average mass change: -0.284 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE
Test was verified on 12/2/2025 ✔
