Summary for Test 2025-11-01-21-4
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1001850 DEA: 081T3304 EFIS: 0826000040 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-38- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/26/2025) |
Sample Information
| Sample Taken Date | 11/01/2025 | Sample Unique Key | 21 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/03/2025 |
| Sample type | Acceptance | A brief description of the sample | 1"xNo.4, Pea Gravel, & WCS Aggregate PCC |
| The quantity of what the sample constitutes | 8 CY | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Nault |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Robertson's Ready Mix — Big Bear | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0072 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt at Hi-Grade Materials, Hesperia Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | SC675B34 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-11-01-21
DIME Test ID: 2025-11-01-21-4
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-12-01
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Robert Jarquin
Date of test: 11/01/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.9
Sand reading (test 1): 4
Clay reading (test 2): 4.8
Sand reading (test 2): 4.1
Sand equivalent (test 1): 82
Sand equivalent (test 2): 86
Sand equivalent before temperature correction: 84
Sand equivalent after temperature correction: 84
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/1/2025 ✔
