Summary for Test 2025-11-23-10-3

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 994864
DEA: 050N74U4
EFIS: 0522000025
DIST-CO-RTE-PM05-SB-101-9.9/10.6
Award Date07/10/2023
Closeout DateNot set
Work DescriptionSB 101 4D North San Ysidro to Olive Mill
Location DescriptionIn Santa Barbara County in and near Santa Barbara from 0.1 mile south of San Ysidro Road Overcrossing to 0.1 north of Olive Mill Road Overcrossing
QA Service Level1 (Verified on 08/21/2023)

Sample Information

Sample Taken Date11/23/2025 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/23/2025
Sample typeQuality Assurance A brief description of the sampleConcrete Test Samples
The quantity of what the sample constitutes450 CY From where was the sample collectedSupplier
First name of sampler or witnessed byJesse Last name of sampler or witnessed byGomez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Padaro Concrete Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number386
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected18247
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarged from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-11-23-10
DIME Test ID: 2025-11-23-10-3
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-11-25

Test Results


Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Eduardo Gomez
Date of test: 11/23/2025
Air content: 3.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/25/2025