Summary for Test 2025-09-03-105-1
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1001375 DEA: 040A53T4 EFIS: 0421000155 COOP: 040A53TCM |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-L1.8/L3.2 |
| Award Date | 06/20/2025 |
| Closeout Date | Not set |
| Work Description | Construct I-80 WB Truck Scales |
| Location Description | CONSTRUCTION ON STATE HIGHWAY IN SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM THE 80/12 EAST JUNCTION TO 0.9 MILE EAST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 FROM 0.5 MILE WEST OF DAN WILSON CREEK BRIDGE TO WEST TEXAS STREET UNDERCROSSI |
| QA Service Level | 1 (Verified on 07/10/2025) |
Sample Information
| Sample Taken Date | 09/03/2025 | Sample Unique Key | 105 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/03/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Imported Borrow |
| The quantity of what the sample constitutes | 2000 SQYD | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Casey | Last name of sampler or witnessed by | Farrington |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Collected at jobsite | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-09-03-105
DIME Test ID: 2025-09-03-105-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-11-25
Test Results
Is oversize material: No
Input Type: Calculated
Tester's full name: Casey Farrington
Date of test: 09/03/2025
In-place wet density: 2.14
Highest adjust wet density: 2.26
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/25/2025 ✔
