Summary for Test 2025-11-06-65-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994583 DEA: 07333604 EFIS: 0716000313 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2-2.3/14.2 |
| Award Date | 11/26/2024 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC, PLACE HMA, REPLACE CURB RAMPS AND TRAFFIC SIGNALS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM CENTINELA AVENUE TO GLENDALE BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/24/2023) |
Sample Information
| Sample Taken Date | 11/06/2025 | Sample Unique Key | 65 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/06/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 69 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ikechi | Last name of sampler or witnessed by | Okoro |
| Title of sampler | Field Technician | Telephone number of sampler | 909-657-1716 |
| Laboratory sample identification | 25-3673 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-11-06-65
DIME Test ID: 2025-11-06-65-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-11-24
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Ikechi Okoro
Date of test: 11/06/2025
Sum of Count or Density: 3536 g/cc
Average of Count or Density: 1179 g/cc
Sum of Moisture Count: 489 g/cc
Average of Moisture Count: 163 g/cc
Count Ratio Density: 2.11
Count Ratio Moisture: 0.2
Calculated Percent Relative Compaction: 95.5 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/24/2025 ✔
