Summary for Test 2025-10-17-51-1
Test performed: CTM 203-February 2008Project Information
| Project Identifiers | Project ID: 1000136 DEA: 024H7504 EFIS: 0219000058 |
|---|---|
| DIST-CO-RTE-PM | 02--299-49/72 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Poker Bar Culverts |
| Location Description | TRI 299 PM 49.0-72.0 |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/17/2025 | Sample Unique Key | 51 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/17/2025 |
| Sample type | Preliminary | A brief description of the sample | 2 Bags Soil |
| The quantity of what the sample constitutes | Gravel Filter Design | From where was the sample collected | Source |
| First name of sampler or witnessed by | Derek | Last name of sampler or witnessed by | Serna |
| Title of sampler | MREA | Telephone number of sampler | |
| Laboratory sample identification | D80096 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | D2 Mat Lab | Transportation Laboratory (TL) Number | 897623 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Outlet of Culvert PM 66.63 TRI 299 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-10-17-51
DIME Test ID: 2025-10-17-51-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2025-11-24
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Josh Murphy
Date of test: 11/24/2025
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99 %
Cumulative percent passing the 3/8 in. sieve: 99 %
Cumulative percent passing the #4 sieve: 94 %
Cumulative percent passing the #8 sieve: 79 %
Cumulative percent passing the #16 sieve: 60 %
Cumulative percent passing the #30 sieve: 43 %
Cumulative percent passing the #50 sieve: 30 %
Cumulative percent passing the #100 sieve: 19 %
Cumulative percent passing the #200 sieve: 11 %
Cumulative Percent Passing on 5 Microns: 4 %
Cumulative Percent Passing on 1 Micron: 2 %
General comments (publicly viewable) (Max 1000 characters): D₈₅=3.0-mm, D₅₀=606-μm, D₁₅=58-μm
Test was verified on 11/24/2025 ✔
