Summary for Test 2025-07-10-130-2

Test performed: AASHTO T275-07r12

Project Information

Project IdentifiersProject ID: 994369
DEA: 042K6404
EFIS: 0416000480
DIST-CO-RTE-PM04-SM-84-6.0
Award Date07/14/2023
Closeout Date02/26/2025
Work DescriptionCONSTRUCT SOLDIER PILE WALL.
Location DescriptionSAN MATEO COUNTY NEAR LA HONDA 0.2 MILE WEST OF SAN GREGORIO CREEK BRIDGE
QA Service Level1 (Verified on 04/05/2023)

Sample Information

Sample Taken Date07/10/2025 Sample Unique Key130
Date that the sample was received by the laboratory/organization performing the testing07/10/2025 Sample typeQuality Assurance
A brief description of the sample3/4"RHMA-SP The quantity of what the sample constitutes750 Tons
From where was the sample collectedJob Site First name of sampler or witnessed byChristian
Last name of sampler or witnessed bySousa Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert Woodland
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/4 inch Lot number2
Sublot number6 HMA Mix Number
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Test Details

DIME Sample ID: 2025-07-10-130
DIME Test ID: 2025-07-10-130-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Test Release Date: 2025-11-24

Test Results


Number of tests: 3
What test procedure is performed?: Method A
Input Type: Calculated
Tester's full name: Henry Concepcion
Date of test: 07/15/2025
123

2.350

2.310

2.324

2.328
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/24/2025 ✔