Summary for Test 2025-06-26-123-6
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 1000117 DEA: 020J0104 EFIS: 0219000044 |
|---|---|
| DIST-CO-RTE-PM | 02-TEH-99-4.2/4.8 |
| Award Date | 07/11/2024 |
| Closeout Date | Not set |
| Work Description | PLACE HMA, CCTV TOWER AND INSTALL LIGHTING SYSTEM. |
| Location Description | TEHAMA COUNTY ABOUT 7.0 MILES SOUTH OF LOS MOLINOS FROM 0.3 MILE SOUTH OF SOUTH AVENUE TO 0.6 MILE SOUTH OF VINA ROAD |
| QA Service Level | 1 (Verified on 03/18/2024) |
Sample Information
| Sample Taken Date | 06/26/2025 | Sample Unique Key | 123 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 3/4-inch Type A HMA (PG 70-10) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | White |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D79924 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Knife River — Orland Plant (Orland, CA) | Transportation Laboratory (TL) Number | 858138 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 3907716 |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | JMF3513202517 | |
| Binder content (%) | 4.5 | Virgin binder PG | PG 70-10 |
| Design binder PG | PG 70-10 | Binder Supplier | Pacific Northwest (Stockton, CA) |
| RAP content (%) | 15 | WMA Additives | No |
| Antistrip type | Lime |
Test Details
DIME Sample ID: 2025-06-26-123
DIME Test ID: 2025-06-26-123-6
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2025-11-20
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method: PMLC
Input Type: Measured
Tester's full name: Dennis Hickey
Date of test: 07/08/2025
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: 7.3 %
Air Void Content for specimen A-2: 7.0 %
Air Void Content for specimen B-1: 6.9 %
Air Void Content for specimen B-2: 6.8 %
Stripping Inflection Point (Wheel A): >15000
Stripping Inflection Point (Wheel B): >15000
Maximum impression at 5000 passes (left wheel): 1.06 mm
Maximum impression at 5000 passes (right wheel): 1.29 mm
Average impression at 5000 passes (left/right avg): 1.18 mm
Maximum impression at 10000 passes (left wheel): 1.22 mm
Maximum impression at 10000 passes (right wheel): 1.51 mm
Average impression at 10000 passes (left/right avg): 1.37 mm
Maximum impression at 15000 passes (left wheel): 1.38 mm
Maximum impression at 15000 passes (right wheel): 1.74 mm
Average impression at 15000 passes (left/right avg): 1.56 mm
Maximum impression at 20000 passes (left wheel): no data
Maximum impression at 20000 passes (right wheel): no data
Average impression at 20000 passes (left/right avg): no data
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: no data
General comments (publicly viewable) (Max 1000 characters): Nf>15000,
SIP>15000,
Rut=0.1in.@N15000
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| D79924, 858138, 02-0J0103, HWT | 836.57 KB | 11/20/2025 | 2025-06-26-123-6 | Info |
Test was verified on 11/20/2025 ✔
