Summary for Test 2025-09-22-40-7
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1000852 DEA: 112N1974 EFIS: 1123000094 |
|---|---|
| DIST-CO-RTE-PM | 11-IMP-111-23.5/32.1 |
| Award Date | 04/16/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, HMA-A, RHMA-G, MICROSURFACING, & PAVEMENT MARKINGS. |
| Location Description | IMPERIAL COUNTY NEAR BRAWLEY AND CALIPATRIA AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 78 TO 0.4 MILE SOUTH OF ROUTE 115 |
| QA Service Level | 1 (Verified on 05/02/2025) |
Sample Information
| Sample Taken Date | 09/22/2025 | Sample Unique Key | 40 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/25/2025 | Sample type | Verification |
| A brief description of the sample | JMFR | The quantity of what the sample constitutes | 12 boxes |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Mohammed |
| Last name of sampler or witnessed by | Masud | Title of sampler | TET |
| Telephone number of sampler | 6199021073 | Laboratory sample identification | 25-09-22-40-JMFR |
| Linked DIME Sample ID | 2025-09-22-41 | The fabricator/manufacturer/facility name | API Gateway |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 39 API Val | |
| Binder content (%) | 4.5 | Virgin binder PG | PG 70-10 |
| Design binder PG | PG 70-10 | Binder Supplier | Valero |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type | Lime |
Test Details
DIME Sample ID: 2025-09-22-40
DIME Test ID: 2025-09-22-40-7
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-12-02
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Mohammad Abbassi
Date of test: 11/18/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4021.4 g
Mass of the specimen and specimen basket assembly prior to ignition: 5579.8 g
Mass of HMA Sample prior to ignition: 1558.4 g
Mass Loss: 97.8 g
Mass of aggregate remaining after ignition: 1460.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.48 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.80 %
General comments (publicly viewable) (Max 1000 characters): Split out 10 C.F. Samples
Test was verified on 12/2/2025 ✔
