Summary for Test 2025-11-06-30-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993678 DEA: 042Q8004 EFIS: 0419000050 COOP: 042836,042944 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4 |
| Award Date | 01/22/2025 |
| Closeout Date | Not set |
| Work Description | US 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/15/2022) |
Sample Information
| Sample Taken Date | 11/06/2025 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/10/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Barsplice Double Barrel Zap Screwlok |
| The quantity of what the sample constitutes | 60 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | NA | Last name of sampler or witnessed by | NA |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Transpacific Steel Yard | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Cascade |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #6 | Coupler Model | Double Barrel Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 5050 | Rebar Heat Number(s) | 073625 |
| Rebar Size 2 | Coupler Unique ID | SBT-17-01 |
Test Details
DIME Sample ID: 2025-11-06-30
DIME Test ID: 2025-11-06-30-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2025-11-18
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 11/18/2025
UTM: NA
Halo ID: na
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 6 | 0.44 | 0000 | 37810 | 86000 | service splice | Kleinfelder |
| 2 | 2 | 1 | 6 | 0.44 | 0000 | 37040 | 84000 | service splice | Kleinfelder |
| 3 | 3 | 1 | 6 | 0.44 | 0000 | 35460 | 80500 | service splice | Kleinfelder |
| 4 | 4 | 1 | 6 | 0.44 | 0000 | 37950 | 86500 | service splice | Kleinfelder |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/18/2025 ✔
