Summary for Test 2025-11-10-9-3
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1000682 DEA: 09379104 EFIS: 0919000005 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-91.6/100.8 |
| Award Date | 02/20/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS. |
| Location Description | INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168 |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 11/10/2025 | Sample Unique Key | 9 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/10/2025 |
| Sample type | Quality Assurance | A brief description of the sample | HMA181 |
| The quantity of what the sample constitutes | 118-122K Air Void Milestone | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jerid | Last name of sampler or witnessed by | Kupelian |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | RHB Plant Independence | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-11-10-9
DIME Test ID: 2025-11-10-9-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-11-14
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 11/14/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 4255.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 6433.6 g
Mass of HMA Sample prior to ignition: 2178.0 g
Mass Loss: 115.6 g
Mass of aggregate remaining after ignition: 2062.4 g
Correction Factor (Percent by mass of HMA Specimen): 0.38 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.93 %
General comments (publicly viewable) (Max 1000 characters): HMA-181
Test was verified on 11/14/2025 ✔
