Summary for Test 2023-01-26-128-4

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 214469
DEA: 030H08U4
EFIS: 0319000029
DIST-CO-RTE-PM03-SAC-50-L0.2/R6.1
Award Date06/30/2020
Closeout DateNot set
Work DescriptionSac 50 Design Build PLEASE NOTE THAT DESIGN BUILDER MUST PERFORM QUALITY VALIDATION TESTING IN ACCORDANCE WITH THE MATERIAL CONTROL SCHEDULE (MCS) FOR ITEMS SUCH AS STRANDS, HS BOLTS, ELASTOMERIC BEARING PADS, JOINT SEALANTS, COUPLERS & WELDED HOOPS, ETC
Location DescriptionFROM 0.1 MILE EAST OF I-5 TO 0.8 MILE EAST OF WATT AVE
QA Service Level1 (Verified on 10/23/2019)

Sample Information

Sample Taken Date01/26/2023 Sample Unique Key128
Date that the sample was received by the laboratory/organization performing the testing01/04/2023 Sample typeQuality Assurance
A brief description of the sampleBR-19 BENT 4 RAT SLAB The quantity of what the sample constitutes0 -1000 Cy
From where was the sample collectedManufacturer First name of sampler or witnessed byJarrad
Last name of sampler or witnessed byMcCabe Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCemex
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number1615453
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected30605768
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-01-26-128
DIME Test ID: 2023-01-26-128-4
Testing Lab: CT D03 - Rocklin Construction Field Office
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2025-11-14

Test Results


Input Type: Calculated
Tester's full name: Jarrad McCabe
Date of test: 01/26/2023
Temperature: 63 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/14/2025 ✔