Summary for Test 2025-10-10-60-7
Test performed: AASHTO T269-24E25Project Information
| Project Identifiers | Project ID: 1001220 DEA: 040X6604 EFIS: 0424000154 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-84-R21.4/R23.1 |
| Award Date | 06/25/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA-G. |
| Location Description | ALAMEDA COUNTY IN AND NEAR PLEASANTON AND LIVERMORE FROM 0.1 MILE SOUTH OF VEHICLE UNDERCROSSING SOUTH TO 0.1 MILE SOUTH OF RUBY HILL DRIVE |
| QA Service Level | 1 (Verified on 04/28/2025) |
Sample Information
| Sample Taken Date | 10/10/2025 | Sample Unique Key | 60 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/13/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4"RHMA-G |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mond | Last name of sampler or witnessed by | Osawaru |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Teichert Materials Vernalis | Transportation Laboratory (TL) Number | C771479 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 3930165 |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 7 | HMA Mix Number | 30242532510V |
| Binder content (%) | 7.5 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | |
| RAP content (%) | Not set | WMA Additives | Yes |
| Antistrip type |
Test Details
DIME Sample ID: 2025-10-10-60
DIME Test ID: 2025-10-10-60-7
Testing Lab: CT D04 - Pleasanton Field Laboratory
Test Method: AASHTO T269-24E25: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2025-11-12
Test Results
Is the sample lab compacted or field compacted?: Field compacted
Number of tests: 2
Input Type: Measured
Tester's full name: Ikenna Ezeude
Date of test: 11/03/2025
Bulk Specific Gravity: 2.238
Bulk Specific Gravity 2: 2.255
Theoretical Maximum Specific Gravity: 2.376
Percent Air Voids: 5.8 %
Percent Air Voids 2: 5.1 %
Average Percent Air Voids: 5.4 %
Average Core Density: 94.6 %
General comments (publicly viewable) (Max 1000 characters): Lot 1 SL. 9
Test was verified on 11/12/2025 ✔
