Summary for Test 2025-11-06-27-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1001806 DEA: 081R7304 EFIS: 0825000112 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-138-R18.90(30.42) / 19.50(31.38) |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Director's Order to Install Drainage System |
| Location Description | In County of San Bernardino, from 0.6 mile west of Summit Post Office Road to Summit Post Office Road |
| QA Service Level | 1 (Verified on 11/10/2025) |
Sample Information
| Sample Taken Date | 11/06/2025 | Sample Unique Key | 27 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/06/2025 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 20177g | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Tony | Last name of sampler or witnessed by | Price |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Job Site Material |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | SR-138 EB, PM 19.2, Sta:190+13.50 | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | mineral filler | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-11-06-27
DIME Test ID: 2025-11-06-27-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-11-07
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Tony Price
Date of test: 11/06/2025
Sum of Count or Density: 3136 g/cc
Average of Count or Density: 1045 g/cc
Sum of Moisture Count: 415 g/cc
Average of Moisture Count: 138 g/cc
Count Ratio Density: 0.59
Count Ratio Moisture: 0.21
Calculated Percent Relative Compaction: 98.5 %
Reported Percent Relative Compaction: 99 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 11/7/2025 ✔
