Summary for Test 2025-11-05-28-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Sample Information
| Sample Taken Date | 11/05/2025 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/05/2025 |
| Sample type | Quality Assurance | A brief description of the sample | LCB Aggregate - Class 2 Base |
| The quantity of what the sample constitutes | 200cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Sal | Last name of sampler or witnessed by | Zepeda |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 251105-1 LCB Agg | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Sierra Pacific - Avenal | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 3857460 |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-10-0006 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | 12452-LCB-1 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-11-05-28
DIME Test ID: 2025-11-05-28-2
Testing Lab: CT D05 - Whitley Gardens Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-11-05
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: Kyle Engen
Date of test: 11/05/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 11.2
Sand reading (test 1): 3.7
Sand equivalent (test 1): 33
Sand equivalent before temperature correction: 33
Sand equivalent after temperature correction: 33
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/5/2025 ✔
