Summary for Test 2025-07-08-95-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994962 DEA: 07357304 EFIS: 0719000062 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-6.6/13.1 |
| Award Date | 04/27/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE SLABS AND MEDIAN BARRIER, |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, DOWNEY AND CITY OF COMMERCE FROM 0.2 MILE SOUTH OF ROUTE 5/605 SEPARATION TO 0.1 MILE NORT |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 07/08/2025 | Sample Unique Key | 95 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/14/2025 |
| Sample type | Acceptance | A brief description of the sample | 3/8 HMA-A |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Zubieta |
| Title of sampler | TEC | Telephone number of sampler | |
| Laboratory sample identification | 25-475 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | 003501 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/8 inch | Lot number | |
| Sublot number | HMA Mix Number | 109726 | |
| Binder content (%) | 5.5 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-07-08-95
DIME Test ID: 2025-07-08-95-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-11-04
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 08/04/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3939.1 g
Mass of the specimen and specimen basket assembly prior to ignition: 5563.4 g
Mass of HMA Sample prior to ignition: 1624.3 g
Mass Loss: 88.8 g
Mass of aggregate remaining after ignition: 1535.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.27 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.20 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/4/2025 ✔