Summary for Test 2025-10-30-16-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1000612 DEA: 120R57U4 EFIS: 1223000131 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-405-11.4/24.2 |
| Award Date | 01/14/2025 |
| Closeout Date | Not set |
| Work Description | PLACE JPCP (RSC) AND RHMA, AND MODIFY ELECTRICAL SYSTEMS. |
| Location Description | ORANGE COUNTY FROM HARBOR BOULEVARD UNDERCROSSING IN COSTA MESA TO LOS ANGELES COUNTY LINE AT ROSSMOOR |
| QA Service Level | 1 (Verified on 09/30/2024) |
Sample Information
| Sample Taken Date | 10/30/2025 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/30/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 RHMAG |
| The quantity of what the sample constitutes | 3/4 RHMAG | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Jimmy | Last name of sampler or witnessed by | Pham |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2025-10-30-16
DIME Test ID: 2025-10-30-16-2
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-11-03
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: David Nguyen
Date of test: 10/31/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3890.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 5892.0 g
Mass of HMA Sample prior to ignition: 2001.4 g
Mass Loss: 143.8 g
Mass of aggregate remaining after ignition: 1857.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.11 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.07 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 2025AC-SP-0081 | 105.80 KB | 10/31/2025 | 2025-10-30-16-2 | Info |
Test was verified on 11/3/2025 ✔
