Summary for Test 2025-07-15-154-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 995125
DEA: 101E3004
EFIS: 1018000273
DIST-CO-RTE-PM10-SJ-5-32.5/49.8
Award Date01/12/2024
Closeout DateNot set
Work DescriptionREMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT.
Location DescriptionSAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE
QA Service Level1 (Verified on 09/26/2023)

Sample Information

Sample Taken Date07/15/2025 Sample Unique Key154
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/15/2025
Sample typeQuality Control A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes5 From where was the sample collectedJob Site
First name of sampler or witnessed byJaime Last name of sampler or witnessed byGalvan
Title of samplerField Technician Telephone number of sampler
Laboratory sample identification675APP Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction, Livermore Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number675APP
The truck number from where the sample was collectedLoad 8 The batch plant ticket number from where the sample was collected0
Concrete batch plantVanguard Livermore The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedBatch Plant Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-07-15-154
DIME Test ID: 2025-07-15-154-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-10-30

Test Results


Input Type: Calculated
Tester's full name: Jaime Galvan
Date of test: 07/15/2025
Air Content: 1.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/30/2025