Summary for Test 2025-10-17-35-5
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/17/2025 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 10/28/2025 |
| Sample type | Aggregate Prequalification Program | A brief description of the sample | Fine Aggregate |
| The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Source |
| First name of sampler or witnessed by | Bryan | Last name of sampler or witnessed by | Dorsch |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Big Rock Creek - LEBATA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0054 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-10-17-35
DIME Test ID: 2025-10-17-35-5
Testing Lab: Coast Aggregates
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-10-29
Test Results
Number of tests: 3
Input Type: Calculated
Tester's full name: Landon Groves
Date of test: 10/28/2025
Temperature correction: 0
Temperature of solution: 10
Clay reading (test 1): 50
Sand reading (test 1): 37
Clay reading (test 2): 49
Sand reading (test 2): 36
Clay reading (test 3): 50
Sand reading (test 3): 38
Sand equivalent (test 1): 74
Sand equivalent (test 2): 74
Sand equivalent (test 3): 76
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 0
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| Caltrans Testing-Big Rock WCS -2025 | 190.27 KB | 10/29/2025 | 2025-10-17-35-5 | Info |
Test was verified on 10/29/2025 ✔
