Summary for Test 2017-12-13-10-1
Test performed: AGGLP SIEVE_ANALYSIS-1Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 12/13/2017 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/13/2017 |
| Sample type | Quality Control | A brief description of the sample | NA |
| The quantity of what the sample constitutes | NA | From where was the sample collected | Other |
| First name of sampler or witnessed by | NA | Last name of sampler or witnessed by | NA |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | NA |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2017-12-13-10
DIME Test ID: 2017-12-13-10-1
Testing Lab: CT HQ - QAM Sacramento Field Laboratory
Test Method: AGGLP SIEVE_ANALYSIS-1: Soils for Corrosion Sieve Analysis
Test Release Date: 2017-12-20
Test Results
Input Type: Calculated
Tester's full name: Clinton Edmiston
Date of test: 12/13/2017
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 49 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/13/2017 ✔
