Summary for Test 2025-10-15-36-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1001065 DEA: 070Y1304 EFIS: 0724000134 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-101-25.9/30.6 |
| Award Date | 05/22/2025 |
| Closeout Date | Not set |
| Work Description | MAINLINE INDIVIDUAL SLAB REPLACEMENT. |
| Location Description | VENTURA COUNTY IN VENTURA FROM 0.1 MILE WEST OF TELEPHONE RD UNDERCROSSING TO VENTURA AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/01/2025) |
Sample Information
| Sample Taken Date | 10/15/2025 | Sample Unique Key | 36 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/22/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Cesar | Last name of sampler or witnessed by | Cesar QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | vulcan saticoy | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Lunday Thagard Company-World Oil - South Gate CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-10-15-36
DIME Test ID: 2025-10-15-36-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-10-28
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 10/24/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 207.829 grams
Mass of container #2 before test (m2i): 208.009 grams
Mass of container #1 after test (m1f): 207.791 grams
Mass of container #2 after test (m2f): 207.972 grams
Mass of empty container #1: 172.801 grams
Mass of empty container #2: 172.878 grams
Mass correction factor: 0.006
Average mass change: -0.101 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/28/2025 ✔
