Summary for Test 2025-10-08-55-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R134.0/R156.5 |
| Award Date | 06/22/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB |
| Location Description | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 08/02/2023) |
Sample Information
| Sample Taken Date | 10/08/2025 | Sample Unique Key | 55 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/16/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | ERIBRTO | Last name of sampler or witnessed by | ARAGON QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Fisher Sand and Gravel Tempe | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2025-10-08-55
DIME Test ID: 2025-10-08-55-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2025-10-21
Test Results
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 10/17/2025
Temperature: 25 C
Ball Penetration (P1): 4 mm
Final Dial reading (F1): 61 mm
Ball Penetration (P2): 2 mm
Final Dial reading (F2): 59 mm
Ball Penetration (P3): 1 mm
Final Dial reading (F3): 60 mm
Resilience 1: 43 %
Resilience 2: 43 %
Resilience 3: 41 %
Average Resilience: 42 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/21/2025 ✔
