Summary for Test 2025-10-18-3-1
Test performed: CTM 552-December 2013Project Information
| Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
| Award Date | 03/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
| Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 10/18/2025 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/18/2025 | Sample type | Acceptance |
| A brief description of the sample | POLYESTER CONCRTE COMPACTION TEST | The quantity of what the sample constitutes | 50 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Michelangelo |
| Last name of sampler or witnessed by | Sese | Title of sampler | TET |
| Telephone number of sampler | 310-345-6204 | Laboratory sample identification | 25-3363 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vanguard Construction | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 53-0714 | Structure name | Church Lane UC |
| Bid Item | Not set |
Material Information
| Material Type | Polyester | Mfg. Lot Number(s) | NA |
|---|---|---|---|
| Batch Number | NA | Mix number | PPC 1121 |
Test Details
DIME Sample ID: 2025-10-18-3
DIME Test ID: 2025-10-18-3-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear Gages
Test Release Date: 2025-10-19
Test Results
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 10/18/2025
Gage No.: 63090
Time of test: 13:10 HH:MM
Standard Count Density: 2190
Standard Density Nuclear Reading 1: 614
Standard Density Nuclear Reading 2: 604
Standard Density: 2160 g/cc
In-Place Density Nuclear Reading: 669
In-Place Density: 2060 g/cc
Standard Density Sum: 1218
Standard Density Average: 609
Standard Density Count Ratio: 0.278
In-Place Density Count Ratio: 0.305
Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): SB Rte. 405 @ Church Lane UC
Concrete Expansion Dam
Test was verified on 10/19/2025 ✔
