Summary for Test 2025-10-03-55-1

Test performed: AASHTO T49-22

Project Information

Project IdentifiersProject ID: 1001059
DEA: 112N2334
EFIS: 1124000191
DIST-CO-RTE-PM11-SD-5,15-Var
Award Date05/22/2025
Closeout Date05/29/2026
Work DescriptionMICROSURFACING, COLD PLANE, HMA TYPE A, SIGN INSTALLATION & STRIPING.
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 05/30/2025)

Sample Information

Sample Taken Date10/03/2025 Sample Unique Key55
Date that the sample was received by the laboratory/organization performing the testing10/13/2025 Sample typeVerification
A brief description of the sampleSubstainable Emulrions The quantity of what the sample constitutes2qt, one container
From where was the sample collectedSource First name of sampler or witnessed byMUSHTAQ
Last name of sampler or witnessed byAli Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameUnknown
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeMSE
Lot NumberNot set Sub LotNot set
Dilution Percentage RateN/A

Test Details

DIME Sample ID: 2025-10-03-55
DIME Test ID: 2025-10-03-55-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T49-22: Standard Method of Test for Penetration of Bituminous Materials
Test Release Date: 2025-10-18

Test Results


Input Type: Calculated
Tester's full name: Hussaya Leelakitrungruang
Date of test: 10/15/2025
Average Penetration: 46 dmm
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/18/2025 ✔