Summary for Test 2025-10-03-55-8
Test performed: AASHTO T59-22Project Information
| Project Identifiers | Project ID: 1001059 DEA: 112N2334 EFIS: 1124000191 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5,15-Var |
| Award Date | 05/22/2025 |
| Closeout Date | 05/29/2026 |
| Work Description | MICROSURFACING, COLD PLANE, HMA TYPE A, SIGN INSTALLATION & STRIPING. |
| Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 05/30/2025) |
Sample Information
| Sample Taken Date | 10/03/2025 | Sample Unique Key | 55 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/13/2025 | Sample type | Verification |
| A brief description of the sample | Substainable Emulrions | The quantity of what the sample constitutes | 2qt, one container |
| From where was the sample collected | Source | First name of sampler or witnessed by | MUSHTAQ |
| Last name of sampler or witnessed by | Ali | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Unknown | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | MSE |
|---|---|---|---|
| Lot Number | Not set | Sub Lot | Not set |
| Dilution Percentage Rate | N/A |
Test Details
DIME Sample ID: 2025-10-03-55
DIME Test ID: 2025-10-03-55-8
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Storage Stability of Emulsified (Sec. 18))
Test Release Date: 2025-10-18
Test Results
Input Type: Calculated
Tester's full name: Hussaya Leelakitrungruang
Date of test: 10/16/2025
Mass of beaker, rod, screen (if used) and top portion residue: 463.1 g
Tare mass of the beaker, rod, and screen (if used for top portion): 431.0 g
Mass of beaker, rod, screen (if used for bottom portion) and bottom portion residue: 450.0 g
Tare mass of the beaker, rod, and screen (if used): 417.6 g
Percent residue from the bottom portion of the sample: 64.8 %
Percent residue from the top portion of the sample: 64.2 %
Storage stability: 0.6 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/18/2025 ✔
