Summary for Test 2025-10-08-50-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
| Award Date | 04/04/2024 |
| Closeout Date | Not set |
| Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
| QA Service Level | 1 (Verified on 10/03/2023) |
Sample Information
| Sample Taken Date | 10/08/2025 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/08/2025 |
| Sample type | Quality Assurance | A brief description of the sample | CTM 231 Test Location |
| The quantity of what the sample constitutes | 440 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ikechi | Last name of sampler or witnessed by | Okoro |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 25-3263 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Aggregate Base | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-10-08-50
DIME Test ID: 2025-10-08-50-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-10-16
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Ikechi Okoro
Date of test: 10/08/2025
Sum of Count or Density: 5319 g/cc
Average of Count or Density: 1773 g/cc
Sum of Moisture Count: 408 g/cc
Average of Moisture Count: 136 g/cc
Count Ratio Density: 2.16
Count Ratio Moisture: 0.17
Calculated Percent Relative Compaction: 95.6 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/16/2025 ✔
