Summary for Test 2025-09-13-18-1
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
| Sample Taken Date | 09/13/2025 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/13/2025 |
| Sample type | Quality Assurance | A brief description of the sample | JPCP beams |
| The quantity of what the sample constitutes | 10 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Alberto | Last name of sampler or witnessed by | Pineda-Gonzalez |
| Title of sampler | Materials Tester | Telephone number of sampler | 5625078483 |
| Laboratory sample identification | 25-3037 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RRM24015 |
|---|---|---|---|
| The truck number from where the sample was collected | Truck 5 | The batch plant ticket number from where the sample was collected | Load 2 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Jobsite | Where the material sample would have been placed if not sampled | Jobsite |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-09-13-18
DIME Test ID: 2025-09-13-18-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2025-10-16
Test Results
Input Type: Calculated
Tester's full name: Alberto Pineda-Gonzalez
Date of test: 09/13/2025
Temperature: 84 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/16/2025 ✔
