Summary for Test 2025-09-10-85-1

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 214649
DEA: 07316004
EFIS: 0715000194
DIST-CO-RTE-PM07-LA-14-60.70
Award Date02/07/2023
Closeout DateNot set
Work DescriptionREHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location DescriptionROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
QA Service Level1 (Verified on 01/29/2020)

Sample Information

Sample Taken Date09/10/2025 Sample Unique Key85
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/10/2025
Sample typeQuality Assurance A brief description of the sample6x12 JPCP cylinders
The quantity of what the sample constitutes431 CY From where was the sample collectedJob Site
First name of sampler or witnessed byAlberto Last name of sampler or witnessed byPineda-Gonzalez
Title of samplerMaterials Tester Telephone number of sampler5625078483
Laboratory sample identification25-2981 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSCI-12622-1
The truck number from where the sample was collectedTruck or Ticket 44 The batch plant ticket number from where the sample was collectedLoad 44
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedJobsite Where the material sample would have been placed if not sampledJobsite
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-09-10-85
DIME Test ID: 2025-09-10-85-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2025-10-16

Test Results


Input Type: Calculated
Tester's full name: Alberto Pineda-Gonzalez
Date of test: 09/10/2025
Temperature: 75 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/16/2025