Summary for Test 2025-09-22-53-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Sample Information

Sample Taken Date09/22/2025 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/25/2025
Sample typeQuality Assurance A brief description of the sample3/4 RHMA-G
The quantity of what the sample constitutes750 Tons From where was the sample collectedManufacturer
First name of sampler or witnessed byMasele Last name of sampler or witnessed byPoueu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBoDean Company Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-49-0032
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBatch Plant Hot Bins
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number1
Sublot number19 Aggregate Mix Number

Test Details

DIME Sample ID: 2025-09-22-53
DIME Test ID: 2025-09-22-53-2
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2025-10-16

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: Cody Cordero
Date of test: 09/23/2025
Sand Equivalent: 62
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/16/2025