Summary for Test 2025-09-30-35-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 09/30/2025 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 10/02/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Bar Splice Grip Twist Coupler |
| The quantity of what the sample constitutes | 150 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mario | Last name of sampler or witnessed by | Alarcon |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Field | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Cascade |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #6 | Coupler Model | Grip Twist Bar Splice |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | C242326, A241127 | Rebar Heat Number(s) | 425722 |
| Rebar Size 2 | Coupler Unique ID | SS-17-05 |
Test Details
DIME Sample ID: 2025-09-30-35
DIME Test ID: 2025-09-30-35-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2025-10-15
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Andrew Auvinen
Date of test: 10/14/2025
UTM: NA
Halo ID: NA
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1A | 425722 | #6 | 0.44 | 0.003 | 39720 | 90500 | NA | M Lee |
| 2 | 1B | 425722 | #6 | 0.44 | 0 | 39710 | 90500 | NA | M Lee |
| 3 | 1C | 425722 | #6 | 0.44 | 0 | 39840 | 90500 | NA | M Lee |
| 4 | 1D | 425722 | #6 | 0.44 | 0 | 39990 | 91000 | NA | M Lee |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/15/2025 ✔