Summary for Test 2025-09-25-71-2

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 1000777
DEA: 07370404
EFIS: 0720000128
DIST-CO-RTE-PM07-LA-5-R59.5/R73.7
Award Date02/06/2025
Closeout DateNot set
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS.
Location DescriptionLOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING.
QA Service Level1 (Verified on 11/25/2024)

Sample Information

Sample Taken Date09/25/2025 Sample Unique Key71
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/06/2025
Sample typeVerification A brief description of the sampleAsphalt Binder Sample
The quantity of what the sample constitutes1can From where was the sample collectedSource
First name of sampler or witnessed byKreetha Last name of sampler or witnessed byMekchai
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGriffith Edmonston Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierSan Joaquin Refinery - Bakersfield CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2025-09-25-71
DIME Test ID: 2025-09-25-71-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-11-13

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 10/09/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 206.379 grams
Mass of container #2 before test (m2i): 207.912 grams
Mass of container #1 after test (m1f): 206.366 grams
Mass of container #2 after test (m2f): 207.903 grams
Mass of empty container #1: 171.538 grams
Mass of empty container #2: 172.880 grams
Mass correction factor: 0.006
Average mass change: -0.026 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/13/2025