Summary for Test 2025-03-21-75-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
| Award Date | 02/27/2023 |
| Closeout Date | Not set |
| Work Description | Wye Segment - Route 41/46 Separation |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 12/16/2022) |
Sample Information
| Sample Taken Date | 03/21/2025 | Sample Unique Key | 75 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/11/2025 |
| Sample type | Dispute Resolution | A brief description of the sample | Dispute Sample |
| The quantity of what the sample constitutes | 4 boxes | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Carlos | Last name of sampler or witnessed by | Manzo |
| Title of sampler | SPM QC | Telephone number of sampler | |
| Laboratory sample identification | 25-03-21-75-A | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Papich Construction | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 2 |
| Sublot number | 67 | HMA Mix Number | L230077A |
| Binder content (%) | 4.8 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | SJR |
| RAP content (%) | 15 | WMA Additives | Yes |
| Antistrip type | - |
Test Details
DIME Sample ID: 2025-03-21-75
DIME Test ID: 2025-03-21-75-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-10-08
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 10/08/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3964.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 5993.5 g
Mass of HMA Sample prior to ignition: 2029.5 g
Mass Loss: 136.0 g
Mass of aggregate remaining after ignition: 1893.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.91 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.79 %
General comments (publicly viewable) (Max 1000 characters): Does Not Comply Target 4.80% Tested 5.79%
Test was verified on 10/8/2025 ✔