Summary for Test 2025-09-25-69-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
| Award Date | 04/04/2024 |
| Closeout Date | Not set |
| Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
| QA Service Level | 1 (Verified on 10/03/2023) |
Sample Information
| Sample Taken Date | 09/25/2025 | Sample Unique Key | 69 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 349 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michael | Last name of sampler or witnessed by | Dillon |
| Title of sampler | Michael Dillon | Telephone number of sampler | 909 657 1716 |
| Laboratory sample identification | 25-3137 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | SB 605 Whittier Off-Ramp Gore Area | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Aggregate Base | The fabricator/manufacturer designation for the sample | Compactions Testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-09-25-69
DIME Test ID: 2025-09-25-69-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-10-08
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michael Dillon
Date of test: 09/25/2025
Gage No.: 6901
Test No.: 1
Nuclear By: Michael Dillon
Non-Bias Plan No.: 1
Depth: 6"
Material No.: Class 2 Aggregate Base
Material Type: Aggregate Base
Impact By: Michael Dillon
Standard Count Density: 8547 g/cc
Count or Density 1: 10173 g/cc
Count or Density 2: 10523 g/cc
Count or Density 3: 10109 g/cc
Standard Count Moisture: 19258 g/cc
Moisture Count 1: 3133 g/cc
Moisture Count 2: 3373 g/cc
Moisture Count 3: 3259 g/cc
Sum of Count or Density: 30805 g/cc
Average of Count or Density: 10268.33 g/cc
Sum of Moisture Count: 9765 g/cc
Average of Moisture Count: 3255 g/cc
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/8/2025 ✔
