Summary for Test 2025-06-05-92-1
Test performed: AASHTO T315-24Project Information
| Project Identifiers | Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-32.5/49.8 |
| Award Date | 01/12/2024 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE |
| QA Service Level | 1 (Verified on 09/26/2023) |
Sample Information
| Sample Taken Date | 06/05/2025 | Sample Unique Key | 92 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/30/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 Type A HMA W/22%RAP |
| The quantity of what the sample constitutes | 1 CAN PG 64-16 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Treven | Last name of sampler or witnessed by | Fulkerson |
| Title of sampler | TECHNICAN | Telephone number of sampler | |
| Laboratory sample identification | I-5 PAVING | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert Vernalis | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 043619 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | 7 |
| Sublot number | 19 | Tank number | |
| Time of sample | HMA Supplier | Teichert Vernalis Plant | |
| Certified Asphalt Supplier | Pacific Northwest Oil - Stockton CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-06-05-92
DIME Test ID: 2025-06-05-92-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2025-10-03
Test Results
Phase: Original binder
Input Type: Measured
Tester's full name: Amare Tefera
Date of test: 10/03/2025
Test Gap: 1 mm
Test Frequency: 10.0 rad/s
Strain Amplitude: 12.06 %
Stress Amplitude: 0.125 kPa
Phase Angle (δ) (for the 10 cycles): 88.2 degree
Complex Modulus (G*) (for the 10 measurements): 1.038 kPa
Test Temperature (Specimen 1): 64.0 C
Dynamic Shear, G*/sin(δ): 1.04 kPa
General comments (publicly viewable) (Max 1000 characters): OG
Test was verified on 10/3/2025 ✔
